BrokerPilotStart free
← Intelligence

Sample report

A full strata review.

This is a complete review exactly as Intelligence produces it for one building: 26 documents read, every finding cited to the document it came from. It is a sample; the building, figures and dates are from that file.

Executive Summary

Parking
Stall #42 — common property, allocated with Strata Council approval (rented at an unspecified monthly rate per Form B).
Storage & lockers
No storage locker is available for this strata lot.

Key findings

0 critical · 9 watch · 4 clean
WatchDepreciation report rating

The most recent depreciation report update was prepared by RDH Building Science Inc. and submitted November 10, 2023, based on a site visit of August 2, 2023 and 2022/2023 fiscal year financial data. As of today (July 30, 2026) the report is approximately 2 years and 8 months old. The previous report was dated May 31, 2019. The Strata Property Act requires updates every 5 years (formerly 3 years under the 2023 report's own language); the next update would be due around 2026–2028. No updated report has been distributed to owners as of the documents on file.

WatchLarge Near-Term Special Levies Projected

The depreciation report (November 2023) projects approximately 22 special levies totalling roughly $7,800,000 over 30 years under the current $30,000/year CRF contribution. Even the highest alternative scenario ($60,000/year with 5% annual increases) still projects ~6 levies totalling ~$5,000,000. Major near-term items include podium waterproofing (~$1,020,000 CYD, 2025), domestic water re-piping (~$400,000 CYD, 2026), SBS roof replacement (~$266,000 CYD, 2028), asphalt shingle roof (~$232,800 CYD, 2028), and elevator modernization (~$122,000 CYD, 2025). The $150,000 recirculation line levy (March 2026) addresses only one component.

WatchPodium Waterproofing Status Unclear

The depreciation report scheduled podium waterproofing membrane replacement for 2025 at an estimated $1,020,000 (CYD). The current CRF balance of $271,463.23 (June 30, 2026) is well below the projected cost. No minutes or financial documents confirm this project has been approved, levied, or commenced. The status of this major capital item is not confirmed in the documents provided.

WatchRecirculation Line Leaks & Levy

The strata experienced at least five water leaks from recirculation lines over the two years prior to July 2025, causing approximately $52,000 in common property damage. A $150,000 special levy was approved at the March 24, 2026 SGM (Unit 312 share: $3,800.41, due May 15, 2026). Form B shows $0.00 owing for this unit. The broader domestic water distribution re-piping (estimated $400,000 CYD) remains a separate near-term capital item not yet funded.

WatchMake-Up Air Unit Failure

The make-up air unit and heat exchanger were shut down due to failure and safety concerns as of March 2026. Replacement was approved by owners (up to $50,000 from CRF) and Woola Mechanical was engaged. Completion is not confirmed in the documents on file.

WatchCRF Underfunded vs. Near-Term Needs

The depreciation report characterizes the current $30,000/year CRF contribution as representing only 13% of the progressive reserve benchmark. The CRF balance as of June 30, 2026 is $271,463.23. Multiple large capital expenditures are forecast within the next 2–5 years (roofs, podium, plumbing, elevator), and the current CRF level is insufficient to fund them without special levies.

WatchBECA Not Yet Completed

The 2023 depreciation report recommends a Building Enclosure Condition Assessment (BECA) be completed prior to or alongside the next depreciation report update, to refine renewal timing for roofs, podium waterproofing, cladding, windows, and balcony membranes. No evidence of a completed BECA appears in the documents provided.

WatchEV Charging – No Chargers Installed

The electrical planning report (July 2025) confirms the strata has sufficient electrical capacity to support up to 20 Level 2 and 40 Level 1 EV chargers within the existing 1,200-amp service using a phased approach. No EV chargers are currently installed and no EV bylaw or owner-install policy is documented in the materials provided.

WatchParkade Water Seepage Noted

The 2023 depreciation report site visit observed localized active water seepage from the southwest exterior stair wall into the parkade (ponding water adjacent to Stall 37). This was noted as an observation; no remediation is documented in the subsequent minutes.

CleanRecently completed levy

Completed 2026 — Special levy of $150,000 (total) approved by 3/4 vote at the SGM held March 24, 2026, for replacement of hot and cold-water recirculation lines in common areas (excluding strata lots). Due date was May 15, 2026. Strata Lot 18 (Unit 312) share: $3,800.41. Physical work was approved to commence after May 15, 2026; as of the Form B date (July 29, 2026) Form B section (d) shows $0.00 owing, indicating this unit's levy has been paid.

CleanNo amounts owing on this unit

$0.00

CleanBudget on track — no expected overage

N/A

CleanNo active or pending litigation disclosed

Source documents reviewed contain no notice of outstanding legal proceedings or judgments.

Financials

Contingency Reserve Fund

Current
Current CRF balance
$271,463
As of 2026-06-30
CRF health: Lean · 45/100Reserve holds 128% of the annual operating budget (above the 25% Strata Act floor). Depreciation report shows it 13% funded.

Form B

Monthly strata fee
$477/mo
Amounts owing
$0.00
Over / under budget
N/A
Annual budget
$242,075
Special levies
Completed 2026 — Special levy of $150,000 (total) approved by 3/4 vote at the SGM held March 24, 2026, for replacement of hot and cold-water recirculation lines in common areas (excluding strata lots). Due date was May 15, 2026. Strata Lot 18 (Unit 312) share: $3,800.41. Physical work was approved to commence after May 15, 2026; as of the Form B date (July 29, 2026) Form B section (d) shows $0.00 owing, indicating this unit's levy has been paid.

Where your strata fees go

Annual split · CRF top-up vs operating
OPERATING87.6%CRF12.4%$212K$30K

Of every dollar collected in strata fees, 88¢ funds day-to-day operations and 12¢ is set aside in the Contingency Reserve Fund for future capital work.

Annual budget breakdown

OPERATING$212KANNUALInsurance$42K19.8%Utilities – Natural Gas$25K11.8%Property Management$24K11.4%General Repairs & Maintenance$24K11.3%Landscaping Services$21K9.9%Utilities – Electricity$11K5.0%Janitorial Services$10K4.7%Building Envelope Maintenance (BEMP)$9K4.2%Garbage Disposal & Recycling$8K3.8%Other$39K18.2%

Depreciation & Special Levies

A depreciation report is the building’s long-range repair budget. An engineering firm inventories every shared component — roof, windows, elevators, piping, envelope, boilers — estimates how many years each has left and what replacing it will cost, then projects those costs over the next 30 years against what the strata is putting aside. BC stratas of five units or more must have one and renew it every five years. It matters to a buyer because it is the clearest evidence of what is coming: where the projected balance stays healthy, owners keep paying their monthly fees; where it runs short, the shortfall is made up by a fee increase or a special levy billed to whoever owns the unit at the time.

Reserve funded ratio

Report: 2023-11-10
13OUT OF 100050100

The contingency reserve is 13% funded against the depreciation report’s recommended balance — below the 25% Strata Property Act floor, so a mandatory 10%/yr top-up applies.

Contribution options

RDH recommends increasing the annual CRF contribution above the current $30,000/year. Alternative #1 starts at $45,000/year with 5% annual increases (representing 20% of progressive reserve); Alternative #2 starts at $60,000/year with 5% annual increases (representing 27% of progressive reserve). The current scenario (13% of progressive reserve) is projected to require approximately 22 special levies totalling ~$7,800,000 over 30 years.

30-year funding projection (2023–2052)

Source: 2023-11-10
$0$128K$257K$385K$513K202320282033203820432048RecommendedFunded

Near-term big-ticket work

Next 10 years
Wet Sprinkler – Fast Response Heads · Yr 1$16K
Fire Detection & Alarm Devices · Yr 1$15K
DHW Tank – Gas Fired (2014 unit) · Yr 1$12K
Domestic Water Distribution – Inspection · Yr 1$12K
Enterphone System · Yr 1$6K
Storm Sump Pumps and Control Panel · Yr 1$4K

RED = WITHIN 5 YEARS · AMBER = 5–10 YEARS

Recommended vs. done since

Report: 2023-11-10

The report recommended 32 projects — 4 completed, 3 approved or under way, 21 due by 2026 with no evidence in the documents since, 4 not due yet. Items with no evidence may still have been done; the minutes on file may simply not cover them — worth asking the strata.

No evidence
DHW Circulation Pumprec. 2024 · est. $2K

No mention of circulation pump replacement in post-report documents.

Completed2026-03-24
DHW Tank – Gas Fired (2014 unit)rec. 2024 · est. $12K → $15K actual

March 2026 council minutes: 2017 hot water tank (likely the 2014-installed unit per depreciation report) failed; emergency replacement approved up to $15,000 plus tax from CRF.

No evidence
Domestic Water Distribution – Third-Party Inspectionrec. 2024 · est. $12K

No mention of a formal third-party domestic water distribution inspection in post-report documents.

Completed2025-10-02
Enterphone Systemrec. 2024 · est. $6K → $5K actual

2025 AGM minutes: enterphone replaced (old system 30 years old, parts unavailable); up to $5,000 reimbursed from CRF.

No evidence
Fire Alarm Panel – Battery Packsrec. 2024 · est. $750

Annual fire inspections completed but no specific battery pack replacement documented.

No evidence
Fire Detection & Alarm Devicesrec. 2024 · est. $15K

Annual fire inspections completed; smoke detector replacements charged back to individual units (July 2024 minutes) but no common-property detector replacement documented.

No evidence
Overhead Gate Motorrec. 2024 · est. $3K

Garage gate tension springs replaced (November 2025) but no motor replacement documented.

No evidence
Storm Sump Pumps and Control Panelrec. 2024 · est. $4K

Annual sump pump servicing is documented (Blue Moon, $6,407.10 in 2025) but no replacement of the sump pump control panel is mentioned.

No evidence
Wet Sprinkler – Fast Response Headsrec. 2024 · est. $16K

Sprinkler line repairs completed (November 2025) but no fast-response head replacement documented.

No evidence
Concrete Paving – Podium-relatedrec. 2025 · est. $33K

No concrete paving replacement documented; bundled with podium waterproofing which has not commenced.

No evidence
Elevator – Firefighter Operation Switchesrec. 2025 · est. $3K

No firefighter operation switch replacement documented.

No evidence
Elevator – Voice Communication Devicerec. 2025 · est. $4K

No voice communication device installation documented.

No evidence
Elevator Cab & Hoistway – Fixtures/Operator/Interiorrec. 2025 · est. $50K

No elevator cab or hoistway upgrade documented in post-report documents.

No evidence
Emergency Egress Equipment (Exit Signs/Lighting)rec. 2025 · est. $5K

No exit sign or emergency lighting replacement documented.

No evidence
Fire Extinguishersrec. 2025 · est. $750

No fire extinguisher replacement documented in post-report documents.

No evidence
Hydraulic Elevator Equipmentrec. 2025 · est. $65K

No elevator modernization or controls replacement documented in post-report documents.

No evidence
Interlocking Unit Pavingrec. 2025 · est. $10K

No interlocking paving replacement documented.

No evidence
Lobby Door Assemblyrec. 2025 · est. $5K

No lobby door replacement documented in post-report documents.

No evidence
Podium Waterproofing Membranerec. 2025 · est. $1.0M

No approval, levy, or commencement of podium waterproofing replacement documented in any post-report minutes or financial statements.

No evidence
Site Guardrailsrec. 2025 · est. $18K

No site guardrail replacement documented.

In progress2025-11-10
Soft Landscaping Renovationrec. 2025 · est. $22K

Multiple council meetings document ongoing plant replacements and landscaping work (Premier Landscaping); Bartlett Tree Experts engaged for soil treatment and hazard tree removal.

Completed2024-07-22
Timber Retaining Wall – Sectionsrec. 2025 · est. $8K → $4K actual

July 2024 council minutes: retaining wall repair at front entrance completed ($3,562.50).

Completed2025-11-10
Wet Sprinkler – Piping/Gaskets/Valves Renewalrec. 2025 · est. $5K

November 2025 council minutes: sprinkler line leaks repaired (Community Fire); drywall holes patched. Partial renewal of compromised piping.

No evidence
Wet Sprinkler – Zone Control Valvesrec. 2025 · est. $3K

No zone control valve replacement documented.

No evidence
Wood Storage Lockersrec. 2025 · est. $5K

No storage locker reconstruction documented.

No evidence
Carpet Flooring – Common Areasrec. 2026 · est. $58K

Carpet cleaning completed (July 2024, $2,500) but no carpet replacement documented.

In progress2026-03-24
Domestic Water Distribution – Re-piping (Common Property)rec. 2026 · est. $400K

March 2026 SGM: $150,000 special levy approved for recirculation line replacement (subset of full domestic re-piping); work to commence after May 15, 2026. Full domestic distribution re-piping remains outstanding.

Not yet due
Balcony Urethane Membrane Renewalrec. 2027 · est. $63K

A deck recoating request from an owner was noted (July 2025) but no strata-wide balcony membrane renewal documented.

Not yet due
Exterior Sealant Renewalrec. 2027 · est. $25K

No exterior sealant renewal documented.

Not yet due
Fiber Cement Wall – Repaintrec. 2027 · est. $58K

No building-wide fibre cement repainting documented.

Not yet due
Wood Trim – Repaintrec. 2027 · est. $46K

No wood trim repainting documented.

Approved2026-03-24
Make-up Air Unit Replacementrec. 2028 · est. $30K

March 2026 SGM: up to $50,000 from CRF approved for make-up air unit and heat exchanger replacement; Woola Mechanical engaged. Completion not confirmed.

Maintenance & Open Issues

Open & recent work

21 items from minutes
Outstanding2023-08-02
Parkade Water Seepage (Southwest Exterior Stair Wall)

Active water seepage from southwest exterior stair wall into parkade observed at site visit (near Stall 37); no remediation documented in subsequent minutes.

Outstanding2023-08-02
Amenity Room Washroom Ceiling Stains (Possible Pinhole Leaks)

Ceiling stains in amenity room washroom observed at 2023 site visit; possible pinhole leaks in domestic water distribution system; further investigation recommended by RDH.

Outstanding
Podium Waterproofing Membrane Renewal

Depreciation report scheduled renewal for 2025 at ~$1,020,000 CYD; no approval, levy, or commencement documented in minutes or financials.

Outstanding
Domestic Water Distribution Re-piping (Common Property)

Depreciation report scheduled for 2026 at ~$400,000 CYD; the $150,000 recirculation line levy addresses only recirculation lines, not the full domestic distribution system.

Outstanding
Elevator Modernization

Depreciation report scheduled elevator controls, tank unit, valve replacement and cab/hoistway upgrades for 2025 at ~$122,000 CYD; no approval documented.

Outstanding
SBS Roof Membrane Replacement

Depreciation report schedules two-ply SBS roof replacement for 2028 at ~$266,000 CYD; roof maintenance completed 2025 (Design Roofing, up to $12,000).

Outstanding
Asphalt Shingle Roof Replacement

Depreciation report schedules replacement for 2028 at ~$232,800 CYD.

Outstanding
Balcony Urethane Membrane Renewal

Depreciation report schedules renewal for 2027 at ~$62,500 CYD.

Outstanding
Exterior Painting (Fibre Cement Siding and Wood Trim)

Depreciation report schedules repainting of fibre cement siding for 2027 (~$58,000 CYD) and wood trim for 2027 (~$46,000 CYD).

Outstanding
Exterior Sealant Renewal

Depreciation report schedules sealant replacement for 2027 at ~$25,000 CYD.

Outstanding
Building Enclosure Condition Assessment (BECA)

Recommended by 2023 depreciation report prior to or in conjunction with next depreciation report update; no evidence of commissioning in documents.

Approved2026-03-24
Make-Up Air Unit and Heat Exchanger Replacement

Units shut off due to failure and safety concerns; up to $50,000 from CRF approved; Woola Mechanical engaged; parts lead time 6–8 weeks; completion not confirmed in documents.

Approved2026-03-24
Hot Water Tank Replacement (2017 Unit)

2017 hot water tank failed; emergency CRF expenditure up to $15,000 plus tax approved; completion not confirmed in documents.

Commenced2026-03-24
Recirculation Line Replacement (Common Areas)

Special levy of $150,000 approved March 24, 2026; work to commence after May 15, 2026 levy collection; Woola Mechanical engaged.

Completed2025-11-10
Fire Safety Equipment – Sprinkler Line Repairs

Sprinkler line leaks repaired (Community Fire); drywall holes patched.

Completed2025-11-10
Sump Pump Annual Service

Annual sump pump service and maintenance completed by Blue Moon ($6,407.10 plus taxes).

Completed2025-11-10
Garage Gate Tension Springs

Garage gate tension springs replaced.

Completed2025-10-02
Enterphone System Replacement

Old enterphone (30 years old, parts unavailable) replaced; up to $5,000 reimbursed from CRF at 2025 AGM.

Completed2025-07-28
Fire Safety Equipment – Annual Inspection

Annual fire inspection and all deficiencies completed (Community Fire, $2,185); next inspection scheduled April 21, 2026.

Completed2025-07-22
Electrical Planning Report

Completed by Reliance Asset Consulting (report dated July 21, 2025, inspection March 4, 2025); cost reimbursed from CRF at 2025 AGM.

Completed2025-03-25
Electrical Room Sanitary Line Replacement

Emergency leak in electrical room; Blue Moon Plumbing performed hydro flushing and replaced sanitary lines; approved as emergency CRF expenditure.

Water & Moisture History

Reported incidents

7 on record
Incidents by year
01234'061'07'08'09'10'11'12'13'14'15'16'17'18'19'20'21'221'23'241'254
Common property hallway2025-07-28
Recirculation line leak

Repaired (Platinum Restoration remediation, Blue Moon Plumbing repair, drywall patched). Fifth recirculation line leak in two years.

Units and common property2025-03-25
Kitchen faucet leak in an owner's strata lot

Repaired; costs charged back to owner; owner's insurer engaged.

Parkade (below Unit 308)2025-03-25
Shower drain collar leak in Unit 308

Investigated and confirmed; repair completed.

Electrical room2025-03-25
Water line failure in electrical room

Repaired by Blue Moon Plumbing; hydro flushing and sanitary line replacement completed as emergency CRF expenditure.

Mechanical room and adjacent common property2024-07-22
Water line leak in mechanical room

Emergency remediation by Platinum Pro Claim ($11,848.75 from CRF); common property repairs obtained quotes; owners responsible for their own strata lot repairs.

Elevator pit2022-01-01
Water ingress in elevator pit

Repaired in 2022 (per depreciation report maintenance history).

Multiple units and common property (building-wide)2006-04-11
2006 Building Envelope Condition Assessment (BC Building Science Partnership, report dated April 11, 2006) — not a single dated incident. The assessment found premature building envelope failure: face-sealed stucco cladding, failed balcony membranes and inadequate flashings, with widespread water penetration and resultant decay to the wood structure.

Comprehensive building envelope rehabilitation completed in 2008 (new rainscreen cladding, windows, balcony membranes, roofing, sealants, guardrails).

Insurance

Premium history

-5% since 2025
$0$19K$39K$34K2025$32K2026

Coverage summary

  • Policy period April 1, 2026 – April 1, 2027
  • Insured: The Owners of Strata Plan LMS2088, Riverwood Gardens, c/o Meridian Property Management
  • Broker: Coastline Insurance Services Ltd
  • (Coastline | Coastline), Marc Delgado
  • Property insured value: $17,400,000 with 130% Extended Replacement Cost
  • Insurance appraisal dated April 1, 2026 (Year 1 of cycle)
  • Total annual premium (2026–2027): $31,462 plus $475 Legal Expense = $31,937 combined
  • The 2025/2026 insurance premium was $33,627 (per AGM Oct 2025 CRF loan resolution)
  • the 2026/2027 renewal achieved a reduction of approximately $1,500 (per March 2026 council minutes).

Insurance deductibles

Earthquake$100KWater damage$25KSewer backup$25KFlood$25KAll risks$10K

Bylaws & Rules

Pet restrictions

Most asked
Dogs

Maximum 1 dog and 1 cat, or a combination not to exceed 2 animals per strata lot (plus a reasonable number of fish and up to 2 caged birds). All dogs must carry a current municipal licence

Cats

Exotic pets (snakes, reptiles, spiders, large cats) are prohibited

Other

Pets must be registered with council within 30 days. Pets must be leashed (max 6 ft) on common property at all times.

Smoking
Standard›
No smoking in common rooms per the strata rules.
Amenities
Standard›
Amenity room · Pool table · Ping-pong table · Exercise equipment
Storage
Standard›
No storage locker is available for this strata lot.

Amenity rules & booking

  • Pool hours
    Pool and ping-pong table available 8:30 am to 10:00 pm daily.
  • Elevator booking
    Residents must use the elevator service key during moves; doors must not be jammed open.
  • Common rooms general
    Maximum 2 guests per owner/resident; no excessive noise; no smoking; no children under 18 unless accompanied by an adult; users responsible for clean-up.

EV Charging Readiness

Readiness

In progress
EV bylaw
No
Chargers in service
0
Owner installs
—
Owner installs allowed
—

1,200-amp main service with estimated 737 amperes of available capacity (as of July 2025 electrical planning report). The report concludes the existing service can accommodate up to 20 Level 2 EV chargers and 40 Level 1 EV chargers using a phased installation approach without a main service upgrade. No EV charging infrastructure is currently installed.

Electrical planning report completed by Reliance Asset Consulting (report date July 21, 2025, inspection March 4, 2025) as required under SPA s. 94.1. Report recommends phased implementation not exceeding 30% of remaining supply (~293 amperes) before re-evaluating demonstrated load. No EV bylaw or owner-install policy is documented in the bylaws or rules provided.

Meeting Minutes

Recent highlights

Latest: 2026-03-24
  • SGM March 24, 2026: Owners approved a $150,000 special levy (due May 15, 2026) for replacement of common-area hot and cold-water recirculation lines; work to commence after levy collection.
  • SGM March 24, 2026: Owners approved up to $50,000 from the CRF to replace the failed make-up air unit and heat exchanger (units shut off due to safety concerns).
  • Council March 24, 2026: Approved Woola Mechanical to complete the heat exchanger and make-up air unit replacements; hot water tank replacement (2017 unit failed) approved as emergency CRF expenditure up to $15,000 plus tax.
  • AGM October 2, 2025: 4% strata fee increase approved for 2025/2026 fiscal year; CRF loan extension of $33,627 for insurance premium approved; enterphone replacement (up to $5,000) reimbursed from CRF.

Meeting-by-meeting

9 meetings · newest first
SGM · 2026-03-242 notes
Financial3/4 vote resolution passed: up to $50,000 from CRF approved for make-up air unit and heat exchanger replacement (units shut off due to safety concerns).
Financial3/4 vote resolution passed (21 in favour, 7 opposed): $150,000 special levy approved for replacement of common-area hot and cold-water recirculation lines; due May 15, 2026.
CM · 2026-03-2411 notes
GroundsBartlett Tree Experts approved for soil treatment and removal of two hazard trees.
MaintenanceGutter cleaning completed (High Five).
MaintenanceSeagull remediation monthly service discontinued.
MaintenanceWindow cleaning and power washing quotes to be obtained.
MaintenanceWoola Mechanical approved to complete heat exchanger and make-up air unit replacements (per SGM resolution).
MaintenanceAnnual fire inspection scheduled for April 21, 2026; owners to be notified for unit access.
InsuranceInsurance renewed with Coastline; reduction of approximately $1,500 from prior year.
MaintenanceMechanical room line failure repaired; completed.
MaintenanceDryer vent cleaning approved (Air Vac Services).
MaintenanceRecirculation line replacement to commence after May 15, 2026 levy collection; quotes being obtained for optional owner unit re-piping at 25% discount.
MaintenanceHot water tank (2017 unit) failed; replacement approved as emergency CRF expenditure up to $15,000 plus tax.
CM · 2025-11-1010 notes
GroundsDead plant removal and replanting completed (Premier Landscaping).
MaintenanceSump pump annual service and maintenance completed (Blue Moon, $6,407.10 plus taxes); drain cleaning in parkade approved (Woola Mechanical).
MaintenanceGutter cleaning approved (High Five, November).
GroundsSnow removal contract awarded to Limitless Snow Removal.
MaintenanceGarage gate tension springs replaced.
MaintenanceQuarterly mechanical maintenance contract awarded to Woola Mechanical.
MaintenanceSprinkler line repair approved (Community Fire); scheduling in progress.
MaintenanceSGM to be called for recirculation line replacement special levy; scheduled for January 2026.
Bylaw EnforcementBylaw notices issued to four units for storing items in parking stalls.
MaintenanceSprinkler line leaks repaired; drywall holes from repairs approved for patching.
AGM · 2025-10-026 notes
Financial2025-2026 operating budget adopted with 4% strata fee increase (effective September 1, 2025).
FinancialCRF loan extension of $33,627 approved for 2025-2026 insurance premium.
FinancialUp to $3,307.50 from CRF approved to reimburse operating budget for Electrical Planning Report cost.
FinancialUp to $5,000 from CRF approved to reimburse operating budget for enterphone system replacement.
MaintenanceCouncil informed owners that water recirculation lines require replacement; SGM to be called for special levy vote (estimated ~$3,750 per unit).
InfrastructureCouncil elected: Laura Bennett, Sandra Voll, Greg Marlowe.
CM · 2025-07-2813 notes
GroundsDead plant removal and replanting approved (Premier Landscaping).
MaintenanceLight bollard replacements completed.
InfrastructureElectrical planning report: Reliance approved; CRF reimbursement resolution to be brought to next general meeting.
MaintenanceWindow cleaning and power washing completed (Knightsbridge).
MaintenanceAnnual fire inspection and deficiency repairs completed (Community Fire, $2,185).
MaintenanceDryer vent cleaning completed (Air Vac Service, $560 plus taxes).
MaintenanceHallway and staircase electrical outlets replaced; completed.
MaintenanceRoof maintenance completed (Design Roofing, up to $12,000 plus taxes).
MaintenanceHydro flushing of storage rooms completed.
MaintenanceRecirculation line leak: Platinum Restoration remediated water loss; Blue Moon Plumbing repaired line; drywall repaired. Five recirculation line leaks in past two years noted; re-piping to be proposed at AGM.
MaintenanceSeagull remediation on rooftop approved (Atlas Pest Control).
MaintenanceSump pump annual service and maintenance approved (Blue Moon, $6,407.10 plus taxes).
MaintenanceMake-up air unit motor failed; Blue Moon Plumbing replaced motor as emergency measure.
CM · 2025-03-2512 notes
GroundsLandscape contract renewed with Premier Landscaping.
MaintenanceLight bollard replacements completed (Wiens).
InfrastructureElectrical planning report: Reliance approved to perform report; CRF reimbursement resolution to be brought to next general meeting.
MaintenanceWindow cleaning and power washing approved (Knightsbridge, up to $8,000 plus taxes).
MaintenanceAnnual fire inspection approved (Community Fire, $2,185).
MaintenanceDryer vent cleaning approved (Air Vac Service, $560 plus taxes).
MaintenanceHallway and staircase electrical outlets replaced (all common property outlets, $2,730 plus taxes).
MaintenanceRoof maintenance approved (Design Roofing, up to $12,000 plus taxes).
MaintenanceElectrical room leak: Blue Moon Plumbing dispatched for emergency; hydro flushing and sanitary line replacement in electrical room approved as emergency CRF expenditure.
InsuranceStrata insurance renewed with reduction from prior year at $33,627.
MaintenanceKitchen faucet leak caused damage to units and common property; costs charged back to owner; owner's insurer engaged.
MaintenanceUnit 308 shower drain collar leak into parkade investigated and confirmed; repair completed.
CM · 2024-11-056 notes
MaintenanceDryer vent cleaning completed (Air Vac Services, $560 plus taxes).
InsuranceTwo glass damage claims approved for repair by strata insurer; completed.
GroundsSnow removal contract awarded to Complete Landscaping for 2024/2025 winter.
MaintenanceAnnual gutter cleaning approved (High Five); scheduled November 16, 2024.
MaintenanceLight bollard replacements approved (Wiens, two bollards at front entrance).
InfrastructureElectrical planning report legislation noted; council approved Reliance to perform the report; resolution to reimburse operating budget from CRF to be brought to next general meeting.
AGM · 2024-10-014 notes
Financial2024-2025 operating budget adopted with 5.4% strata fee increase (effective September 1, 2024).
FinancialCRF loan extension of $36,666 approved for 2024-2025 insurance premium repayment by August 31, 2025.
FinancialUp to $10,000 from CRF approved to eliminate 2024-2025 operating fund budget deficit.
InfrastructureCouncil elected: Laura Bennett, Paul Harmon, Renee Caldwell, Sandra Voll, Greg Marlowe.
CM · 2024-07-2211 notes
MaintenanceRetaining wall repair at front entrance completed ($3,562.50).
MaintenanceCarpet cleaning completed (up to $2,500).
MaintenanceAnnual fire inspection and all deficiencies completed; $50 bylaw fine applied to units that failed to provide access.
MaintenanceWindow cleaning and power washing of parkade, ramp, stairs and front entrance completed (up to $8,000).
InfrastructureElectrical planning report legislation noted; Property Manager directed to obtain quote.
MaintenanceDryer vent cleaning approved (Air Vac Services, $560 plus taxes).
MaintenanceAmenity room sink repaired (Blue Moon Plumbing).
MaintenanceMechanical room water leak: emergency water remediation and line repair completed; $11,848.75 paid from CRF as emergency expenditure.
Financial2024-2025 budget proposed with 4% strata fee increase; AGM scheduled for October 2024.
Bylaw Enforcement10 bylaw notices issued to units storing items in parking stalls.
MaintenanceCommon property drain line (bathtub drain) repaired by Blue Moon Plumbing.

Title & Charges

No title search on file
Add a Land Title Office title search for this unit and we'll list every charge registered against it and explain what each one is.

Neighbour & Nuisance Flags

Not enough info
Neighbour-flag tracking unlocks once minutes are parsed for owner complaints.

Strata Contacts

RoleNamePhoneEmailPortal
Management companyMeridian Property Management(604) 555-0170d.whitfield@meridianpm.caclients.meridianpm.ca
Strata managerDaniel Whitfield(604) 555-0170d.whitfield@meridianpm.ca—

Sale-Readiness Checklist

Form B (Information Certificate)Latest: 2026-07-29
Confirmed
BylawsLatest: 2018-10-01
Confirmed
RulesOn file
Confirmed
Council / regular minutesLatest: 2026-03-24
✓Jul 2024✓Nov 2024✓Mar 2025✓Jul 2025✓Nov 2025✓Mar 2026
Confirmed
AGM minutesLatest: 2025-10-02
✓Oct 2024✓Oct 2024✓Oct 2025
Confirmed
Financial statementLatest: 2026-06-30
Confirmed
BudgetLatest: 2026-04-20
Confirmed
Depreciation reportLatest: 2023-11-10
Confirmed
Insurance certificateLatest: 2026-04-01
Confirmed
No amounts owing on this unit$0.00
Confirmed
Form B is more than 30 days oldIssued 2026-07-29 (64 days ago) — figures used but confirm a current Form B before closing.
Disclose

Still needed

0 documents pending

All required documents are on file.